top of page

PROJECT 1

"This project examines the relationship of form and function in architectural design.  It encourages the awareness of truth, whatever position the designer takes, and promotes the arbitrary aesthetic of “functional” beauty."

Screen Shot 2018-10-16 at 10.08.35 AM.pn
Project 1: About

INSPIRATION

CAIRO BRIDGE

OLD TRAILS ARCH BRIDGE

EURIPUS BRIDGE

WHITE-OUT TAPE

HOLE PUNCHER

ALAN KEYS

Project 1: Welcome

CONCEPTUAL COMBINATIONS

IN CREATION OF THE CONCEPTUAL TABLE, THE MOVEABLE OBJECTS AND THE SELECTED BRIDGE INSPIRATIONS ALLOW FOR PROCESS OF DETERMINING THE BEST MOVEABLE BRIDGE SOLUTION

Screen Shot 2018-10-10 at 9.31.15 PM.png
Project 1: About

PRELIMINARY DESIGN

INSPIRED BY THE CAIRO BRIDGE AND THE INTERNAL PULLEY SYSTEM OF THE WHITE-OUT, THIS MOVEABLE BRIDGE HAS A ROADBED LIFTED TO LET SHIPS PASS THROUGH.

Screen Shot 2018-10-16 at 11.31.00 AM.pn
Project 1: About

FINAL DESIGN

AN ADDITION OF SUPPORTS AND MATCHED TRUSS-WORK DESIGN AROUND THE PULLEY SYSTEM WERE BOTH ADDED TO THE PRELIMINARY DESIGN. CURVED MEMBERS BETTER ILLUSTRATE THE INTERNAL PULLEY SYSTEM.

Screen Shot 2018-10-16 at 9.42.19 AM.png
Project 1: About
Project 1: Work
All Videos

All Videos

Watch Now
Project 1: Video Player

TRANSFORMATIVE PROCESS

Project 1: Quote
bottom of page